Public-record award history · deduplicated events
Historical market census · All States
5,970 events in filter · $37B captured value · 5,137 with a published value
Census events
Every recovered public pavement letting, award and bid result in scope
| Year | Event date ↓ | Owner / buyer | State / Local | Project | Captured value | Winner | Bidders | Bid result | Category | Service / treatment | Location |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026 | Sep 15, 2026 | City of Tampa | Local | TAM-26-C-00046 — Ybor City CRA 7th Avenue street resurfacing, Phase 3 | — | — | — | Unresolved | Adjacent | Resurfacing (host contract) | City of Tampa — Ybor City CRA, 7th Avenue |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | State | HOLBROOK - LUPTON HIGHWAY (I-40)McCarrell Rd to Querino System Preservation (Restoration/Rehab/Resurface) | $34M | FANN CONTRACTING, INC. | 3 | Final award | Rehab / Resurfacing | The proposed project is located on Interstate 40 in Apache County, in the Northeast District, located at Chambers and the US 191 traffic interchange. The project limits begin at milepost 330.6 and end at milepost 342.2. The project is located partially in Navajo Reservation. The proposed work consists of pavement rehabilitation, includes milling and filling the existing asphaltic concrete of roadway mainline and shoulders, and milled asphalt concrete treatment at designated unpaved crossovers. The work also includes guardrail installation, fence spot repairs, drainage work, bridge repairs, seeding, pavement marking, signing, installing ground-in rumble strips, delineators, traffic control and other related work. | 040 AP 330 |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | State | GLOBE-LORDSBURG HWY (US 70) Cottonwood Wash to Reay Ln System Preservation (Restoration/Rehab/Resurface) | $8.9M | W. W. CLYDE & CO. | 6 | Final award | Rehab / Resurfacing | The proposed project is located between the Towns of Pima and Thatcher in Graham County on US 70. The project begins at MP 330.20 and extending east to MP 335.59. The work consists of milling asphaltic concrete pavement and replacing it with new asphaltic concrete pavement. Additional work includes replacing guardrail and terminals, fencing, ADA improvements, replacing pavement markings and other miscellaneous work. | 070 GH 330 |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | State | EHRENBERG - PHOENIX HIGHWAY (I - 10)CA Border- Dome Rock Rd System Preservation (Restoration/Rehab/Resurface) | $29M | FNF CONSTRUCTION, INC. | 3 | Final award | Rehab / Resurfacing | The proposed project is in La Paz County, begins at California Border and extends northeast along I-10 from Milepost 0.00 to Milepost 11.71. The proposed work consists of mill and replaces AC, remove, and replace guardrail, extend pipe culverts, pavement marking and other related work. | 010 LA 000 |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | State | PRESCOTT-ASH FORK HWY (SR 89) TELEPHONE ROAD TO ROAD 1S CHINADA IMPROVEMENT | $796K | COMBS CONSTRUCTION COMPANY , LLC. | 6 | Final award | Adjacent | The proposed project is located in Yavapai County on SR 89 from MP 326.66 to MP 327.51, in the Chino Valley. The work consists of improving ramps, sidewalks and driveways to comply with ADA requirements. The work includes curb, curb and gutter, driveway, sidewalk ramp, and sidewalk replacement, pavement marking, and other related work. | 999 YV 326 |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | State | ASH FORK-FLAGSTAFF HWY (I-40) Parks Rest Area To Bellemont Fence Replacement | $1.0M | SHOW LOW CONSTRUCTION, INC. | 3 | Final award | Adjacent | The proposed project is located in Coconino County along Interstate 40 (I-40) between mileposts 179 and 185 near Bellemont. The work consists of replacing right of way fence. | 040 CN 181 |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | Mixed | CITY OF SAN LUIS US 95 COUNTY 20 1 2 ST TO COUNRAISED MEDIANS | $1.5M | AJP ELECTRIC, INC. | 2 | Final award | Adjacent | The proposed project is located in Yuma County on US 95, within the City of Luis between County 21st ST to County 22nd ST. The proposed work consists of installing concrete curb, concrete median paving and removal and replacement of asphaltic concrete. The work also includes signing, pavement markings, decomposed granite and other related work. | 0000 YU SLS |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | Mixed | CITY OF CASA GRANDE THORNTON ROAD SR 84 PETERS RDRoad Widening | $4.0M | J. BANICKI CONSTRUCTION, INC. | 5 | Final award | Adjacent | The proposed project is located within the jurisdiction of the City of Casa Grande in Pinal County. The work consists of constructing an additional northbound thru lane on Thornton Road from SR-84 to Peters Road, reconstructing the southern portion of the road and installing new curb and gutter along with raised medians, widening the north portion of the road, installing new lighting along the southern portion of the road, minor drainage improvements, signing, pavement marking and other related works. | 0000 PN CSG |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | Mixed | City of Yuma Avenue A at 16th Street Bus Pull Outs Installation | $291K | COMBS CONSTRUCTION COMPANY , LLC. | 3 | Final award | Adjacent | The proposed project is located in the City of Yuma on the intersection of Avenue A and 16th Street. The work consists of installing two bus pull outs on Avenue A by adding a lane, expanding pedestrian sidewalk, installing a new bus shelter and other related work. | 0000 YU YUM |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | Mixed | CITY OF SURPRISE Waddell Rd; Litchfield Rd-Bull Conduit, Pull Boxes & Fiber Optic Cable | $613K | MICHIANA CONTRACTING, INC. | 6 | Final award | Adjacent | The proposed project is located in Maricopa County within the City of Surprise along Waddell Road from Litchfield Road to Bullard Avenue. The work includes the installation of conduit, pull boxes, fiber optic cabling, providing fiber optic connections to three traffic signal cabinets, and other related work. | 0000 MA SUR |
| 2026 | Aug 21, 2026 | Arizona Department of Transportation | Mixed | 0000 PM 0RV — 0RV-0-(206)T | — | — | — | Board award listed; bid tab unavailable | Classification unresolved | Board-award roster entry; bid-tab document not posted at the cutoff. | 0000 PM 0RV |
| 2026 | Aug 21, 2026 | Nevada Department of Transportation | State | I-80E, Eureka County | $3.8M | Road and Highway Builders, LLC | — | Final award | Classification unresolved | Interstate roadway scope not resolved | Eureka County |
| 2026 | Aug 20, 2026 | Colorado Department of Transportation | State | Project is in Region 1 in Clear Creek County. Project work consists of culvert replacement at the Eisenhower-Johnson Memorial Tunnel. | — | American West Construction | — | Apparent low / bid result — award not verified | Adjacent / excluded | Transportation-support work; pavement scope not identifiable | Clear Creek County |
| 2026 | Aug 20, 2026 | Florida Department of Transportation | State | E1Y76-R0 — Maintenance of traffic | — | — | — | Unresolved | Adjacent | Traffic Control (MOT) | District One — Lee |
| 2026 | Aug 20, 2026 | Ohio Department of Rehabilitation and Correction | State | LOCI Paving/Drainage | — | — | — | Unresolved | Classification unresolved | Paving and drainage | Ohio (facility not verified) |
| 2026 | Aug 20, 2026 | Richland County Engineer | Local | 2026 County Pavement Marking | $78K | Alpha Space Control, LLC | 4 | Apparent low | Adjacent | Pavement marking | Richland |
| 2026 | Aug 20, 2026 | Toledo-Lucas County Port Authority | Local | Innovation Post J-4 Parking Lot Design/Build | $874K | Geo. Gradel Co. | — | Final award | New Construction / Reconstruction | New parking lot design/build | Innovation Post, Lucas County |
| 2026 | Aug 19, 2026 | Michigan Department of Military and Veterans Affairs | State | Camp Grayling — Construct Tie Down Pads | $1.0M | QDV Construction Services, LLC (low bidder; award not confirmed) | 3 | Apparent low | New Construction / Reconstruction | Construct concrete airfield tie-down pads | Camp Grayling, Crawford County |
| 2026 | Aug 19, 2026 | Board of Lake County Commissioners / Lake County Engineer | Local | Blackmore Road Reconstruction Phase 1, Perry Township | — | — | — | Unresolved | New Construction / Reconstruction | Roadway reconstruction | Lake |
| 2026 | Aug 19, 2026 | Butler County Engineer's Office | Local | Cincinnati Dayton Road Resurfacing (Contract 2026-10) | $969K | The John R. Jurgensen Company | — | Final award | Rehab / Resurfacing | Resurfacing | Butler |
| 2026 | Aug 18, 2026 | California Department of Transportation (Caltrans) | State | Construct Conc barrier & MGS, install striping and signing. | $1.1M | Highway Specialty Company | 9 | Apparent low | Adjacent — Markings & Safety | Concrete barrier and MGS with striping and signing | District 04 — Solano |
| 2026 | Aug 18, 2026 | California Department of Transportation (Caltrans) | State | Pavement repair, drainage, MGS, Mod lighting systems and TMS | $2.8M | — | 8 | Apparent low | Adjacent — Markings & Safety | Pavement-repair host contract with MGS | District 04 — Bay Area |
| 2026 | Aug 18, 2026 | Nevada Department of Transportation | State | US95N, Nye County | $8.1M | Las Vegas Paving Corporation | — | Final award | New Construction / Reconstruction | US95 passing-lane / roadway construction | Nye County |
| 2026 | Aug 18, 2026 | City of Wooster | Local | Curb Ramps for FY27 Resurfacing | — | — | — | Unresolved | Adjacent | ADA curb ramp replacement ahead of FY27 resurfacing | Wooster, Wayne |
| 2026 | Aug 17, 2026 | Florida's Turnpike Enterprise | State | E8X09-R0 — Pavement markings — Zone 1 routine maintenance | $694K | ACME Barricades LC | 4 | Final award | Adjacent | Pavement Markings | Broward, Miami-Dade, Palm Beach |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURE PIPE LINING | $383K | TEMPLE & TEMPLE EXCAVATING & PAVING | 4 | Final award | Adjacent | SMALL STRUCTURE PIPE LINING | ON I-865 OVER UNT TO IRISHMAN RUN, 2.73 MILES EAST OF I-65 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE DECK OVERLAY AND SMALL STRUCTURES CONSTRUCTION | $8.2M | BEATY CONSTRUCTION, INC. | 3 | Final award | Adjacent | BRIDGE DECK OVERLAY AND SMALL STRUCTURES CONSTRUCTION | ON I-74W, 5.44 MILES E OF SR 1 OVER US 52 AND IN AND OH RR |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE DECK OVERLAY | $1.3M | CLR, INC. | 7 | Final award | Adjacent | BRIDGE DECK OVERLAY | ON WEST ARLINGTON ROAD OVER I-69, 0.07 MILE NORTH OF SR 46 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE DECK OVERLAY AND BRIDGE COATING | $2.5M | MILESTONE CONTRACTORS LP | 4 | Final award | Adjacent | BRIDGE DECK OVERLAY AND BRIDGE COATING | ON SR 46E OVER EAST FORK WHITE RIVER, 0.12 MILE E OF SR 11 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | $570K | PAUL H ROHE COMPANY INC | 10 | Final award | Adjacent | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | ON SR 3 OVER UNT TO GRAHAM CREEK, 6.61 MILES SOUTH OF SR 7 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE REPLACEMENT AND INTERSECTION IMPROVEMENT | $4.0M | MILESTONE CONTRACTORS LP | 2 | Final award | New Construction / Reconstruction | BRIDGE REPLACEMENT AND INTERSECTION IMPROVEMENT | ON SR 15 OVER WHITEHEAD DITCH, 2.8 MILES NORTH OF US 6 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE COATING | $999K | RIETH-RILEY CONSTRUCTION CO., INC. | 2 | Final award | Adjacent | BRIDGE COATING | ON CR 800N OVER I-94, 2.05 MILES EAST OF US 20 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE COATING | $217K | N I SPANOS PAINTING INC | 4 | Final award | Adjacent | BRIDGE COATING | ON I-94W OVER JENSEN DR., 0.53 MILE EAST OF SR 249 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE COATING | $336K | PIONEER ASSOCIATES, INC. | 4 | Final award | Adjacent | BRIDGE COATING | ON SR 14 OVER PLUNGE CREEK, 0.69 MILE WEST OF SR 13 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SCOUR PROTECTION | $735K | PIONEER ASSOCIATES, INC. | 5 | Final award | Classification unresolved | SCOUR PROTECTION | ON SR 14 OVER BEAL-TAYLOR DITCH, 4.17 MILES WEST OF I-69 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SCOUR PROTECTION | $567K | PIONEER ASSOCIATES, INC. | 4 | Final award | Classification unresolved | SCOUR PROTECTION | ON US 27N OVER ST MARY'S RIVER OVERFLOW, 1.45 MI N OF US 224 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | BRIDGE DECK OVERLAY | $499K | E & B PAVING LLC | 3 | Final award | Adjacent | BRIDGE DECK OVERLAY | ON SR 1 OVER HAINES CREEK, 2.6 MILES SOUTH OF SR 18 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURE REPLACEMENT | $548K | BEATY CONSTRUCTION, INC. | 7 | Final award | Adjacent | SMALL STRUCTURE REPLACEMENT | ON SR 28, 0.18 MILE WEST OF US 27 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | IDIQ, DISTRICT WIDE BRIDGE MAINTENANCE | $1.8M | CLR, INC. | 3 | Final award | Adjacent | IDIQ, DISTRICT WIDE BRIDGE MAINTENANCE | ON VARIOUS ROADS THROUGHOUT THE VINCENNES DISTRICT |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | IDIQ, DISTRICT WIDE BRIDGE MAINTENANCE | $1.6M | RAGLE, INC. | 4 | Final award | Adjacent | IDIQ, DISTRICT WIDE BRIDGE MAINTENANCE | ON VARIOUS ROADS THROUGHOUT THE SEYMOUR DISTRICT |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | HMA OVERLAY, STRUCTURAL | $13M | BROOKS CONSTRUCTION COMPANY INC | 3 | Final award | Rehab / Resurfacing | HMA OVERLAY, STRUCTURAL | ON SR 16 FROM SR 13 TO SR 5 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURES AND DRAINS CONSTRUCTION | $3.7M | MORPHEY CONSTRUCTION, INC. | 1 | Final award | Adjacent | SMALL STRUCTURES AND DRAINS CONSTRUCTION | ON US 31 AT VARIOUS LOCATIONS |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURE PIPE LINING | $304K | MORPHEY CONSTRUCTION, INC. | 2 | Final award | Adjacent | SMALL STRUCTURE PIPE LINING | ON US 27 OVER JOHNSON DITCH, 0.01 MILE SOUTH OF SR 124 |
| 2026 | Aug 14, 2026 | Whitley County | Local | ADA SIDEWALK RAMP CONSTRUCTION | $2.3M | MILESTONE CONTRACTORS LP | 6 | Final award | Adjacent | ADA SIDEWALK RAMP CONSTRUCTION | ALONG VARIOUS ROADS THROUGHOUT THE COUNTY |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURE REPLACEMENT | $1.5M | CRIDER & CRIDER, INC. | 8 | Final award | Adjacent | SMALL STRUCTURE REPLACEMENT | ON US 231 OVER UNT TO GOOSE CREEK, 6.34 MILES SOUTH OF SR 46 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | HMA OVERLAY MINOR STRUCTURAL AND SMALL STRUCTURE | $14M | J H RUDOLPH & CO INC | 2 | Final award | Rehab / Resurfacing | HMA OVERLAY MINOR STRUCTURAL AND SMALL STRUCTURE | ON SR 64 FROM SR 61 TO SR 257 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | SMALL STRUCTURE MAINTENANCE AND REPAIR | $306K | KERNS EXCAVATING, LLC. | 9 | Final award | Adjacent | SMALL STRUCTURE MAINTENANCE AND REPAIR | ON I-69 OVER UNT TO INDIAN CREEK, 2.77 MILES N OF SR 45 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | PAVEMENT PATCHING | $1.6M | E & B PAVING LLC | 2 | Final award | Preservation | PAVEMENT PATCHING | ON I-69 FROM 0.11 MILE S OF SR 332 TO 0.08 MILE S OF US 35 |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | IDIQ, PAVEMENT PATCHING | $1.7M | E & B PAVING LLC | 3 | Final award | Preservation | IDIQ, PAVEMENT PATCHING | ON VARIOUS ROADS THROUGHOUT THE VINCENNES DISTRICT |
| 2026 | Aug 14, 2026 | Indiana Department of Transportation | State | STORM SEWER REPAIR OR REPLACEMENT | $197K | DAVE O'MARA CONTRACTOR INC | 5 | Final award | Classification unresolved | STORM SEWER REPAIR OR REPLACEMENT | ALONG US 52 FROM 40 FT TO 225 FT EAST OF BUTLERS RUN |
Page 1 of 120
Captured value is the published public award or bid amount, never company revenue. Blank values mean the public record did not publish an amount at the time of capture.