PO
Public pavement market intelligence
Pavement Opportunities · Growth Radar
Buyers
Scope · All States · All categories · all buyers
Market map · 8-state geographic view

Public pavement activity by state

TX$12BCA$4.1BOH$3.6BIL$3.4BPA$3.3BNC$3.0BMI$2.6BFL$418M
PreservationRehab / ResurfacingNew Construction / ReconstructionAdjacentBubble size = captured value · click a state

Jump to a state

Captured value

Select a state

Click a bubble on the map (or a row on the right) to see its category mix, state vs local split, and top public buyers.

Cross-state category mix

Captured awarded value

Preservation$940M · 3%
Rehab / Resurfacing$12B · 37%
New Construction / Reconstruction$13B · 42%
Adjacent$5.5B · 17%

Unit-price benchmarks (directional)

Folded from itemized bid-tab observations

TreatmentUnitLowMedianHighObs.
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 10,000+ | 2025
SQYD$1.00$3.50$15.00105
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | <500 | 2025
TON$87.18$522.50$12,500.0096
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | <500 | 2026
TON$125.00$475.00$2,625.0075
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | 10,000+ | 2025
TON$67.65$130.00$220.0054
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | 500–1,999 | 2025
TON$109.70$215.00$850.0053
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 10,000+ | 2026
SQYD$0.70$2.75$10.0048
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | 2,000–9,999 | 2025
TON$99.36$166.00$300.0045
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 10,000+ | 2025
TON$77.35$147.50$199.0042
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 500–1,999 | 2025
SQYD$6.00$17.00$90.0037
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 2,000–9,999 | 2025
SQYD$2.00$8.84$44.0034
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 2,000–9,999 | 2026
SQYD$2.00$10.50$38.0025
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 500–1,999 | 2026
SQYD$3.00$19.00$55.0025
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | 500–1,999 | 2026
TON$150.00$202.00$358.0025
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | <500 | 2025
SQYD$2.20$78.00$900.0024
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 2,000–9,999 | 2025
TON$137.00$185.00$260.0023
COLD PLANE ASPHALT CONCRETE PAVEMENT
COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | <500 | 2026
SQYD$6.00$55.00$1,000.0019
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | 10,000+ | 2026
TON$92.00$118.00$190.0019
HOT MIX ASPHALT (TYPE A)
HOT MIX ASPHALT (TYPE A) | TON | 2,000–9,999 | 2026
TON$103.73$145.00$234.0019
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 500–1,999 | 2025
TON$140.00$230.00$554.1315
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 10,000+ | 2026
TON$111.00$150.00$222.0013
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | <500 | 2025
TON$175.00$369.09$3,200.0012
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 2,000–9,999 | 2026
TON$114.00$172.50$237.008
HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD)
HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | TON | <500 | 2025
TON$63.68$2,600.00$2,600.007
MICRO-SURFACING
MICRO-SURFACING | TON | 500–1,999 | 2025
TON$100.00$200.00$340.007
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 2,000–9,999 | 2026
TON$149.00$180.00$226.007
HOT MIX ASPHALT (TYPE A)(1-100 TON)
HOT MIX ASPHALT (TYPE A)(1-100 TON) | TON | <500 | 2025
TON$260.04$311.88$311.886
MICRO-SURFACING
MICRO-SURFACING | TON | 2,000–9,999 | 2025
TON$85.00$205.00$265.006
MICRO-SURFACING
MICRO-SURFACING | TON | 2,000–9,999 | 2026
TON$80.00$127.50$265.006
MICRO-SURFACING
MICRO-SURFACING | TON | 500–1,999 | 2026
TON$135.00$280.00$400.005
SLURRY SEAL
SLURRY SEAL | TON | 500–1,999 | 2025
TON$142.00$170.00$550.005
SLURRY SEAL
SLURRY SEAL | TON | 500–1,999 | 2026
TON$232.00$329.50$384.004
SLURRY SEAL
SLURRY SEAL | TON | <500 | 2025
TON$515.00$632.50$5,000.004
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15')
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | 500–1,999 | 2025
SQYD$5.79$13.94$13.943
HOT MIX ASPHALT (TYPE A)(FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD)
HOT MIX ASPHALT (TYPE A)(FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) | TON | <500 | 2025
TON$8.11$30.10$98.803
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | <500 | 2026
TON$265.00$480.00$840.003
SLURRY SEAL
SLURRY SEAL | TON | <500 | 2026
TON$555.00$620.00$2,290.003
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15')
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | 2,000–9,999 | 2025
SQYD$5.21$9.57$13.942
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15')
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | <500 | 2025
SQYD$13.94$18.41$22.882
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) | SQYD | <500 | 2025
SQYD$0.97$2.14$3.312
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) | SQYD | 2,000–9,999 | 2025
SQYD$2.96$4.11$5.252
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) | SQYD | 500–1,999 | 2025
SQYD$2.85$2.91$2.962
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | 2,000–9,999 | 2025
SQYD$0.65$2.98$5.302
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | 500–1,999 | 2025
SQYD$5.30$5.30$5.302
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | <500 | 2025
SQYD$5.30$5.77$6.242
HOT MIX ASPHALT (TYPE A)(501-2,000 TON)
HOT MIX ASPHALT (TYPE A)(501-2,000 TON) | TON | 500–1,999 | 2025
TON$183.83$242.72$301.602
HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD)
HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | TON | 500–1,999 | 2025
TON$18.60$1,309.30$2,600.002
MICRO-SURFACING
MICRO-SURFACING | TON | <500 | 2026
TON$445.00$622.50$800.002
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 10,000+ | 2026
TON$85.00$107.50$130.002
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 500–1,999 | 2026
TON$265.00$271.00$277.002
RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 500–1,999 | 2026
TON$203.00$219.50$236.002
SLURRY SEAL
SLURRY SEAL | TON | 2,000–9,999 | 2025
TON$240.00$302.50$365.002
SLURRY SEAL
SLURRY SEAL | TON | 2,000–9,999 | 2026
TON$125.00$137.50$150.002
COLD PLANE ASPHALT CONCRETE PAVEMENT (0.4' DEPTH)
COLD PLANE ASPHALT CONCRETE PAVEMENT (0.4' DEPTH) | SQYD | 2,000–9,999 | 2026
SQYD$7.60$7.60$7.601
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15')
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | 10,000+ | 2026
SQYD$2.44$2.44$2.441
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25')
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25') | SQYD | 10,000+ | 2025
SQYD$8.82$8.82$8.821
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25')
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25') | SQYD | 2,000–9,999 | 2025
SQYD$8.82$8.82$8.821
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) | SQYD | 10,000+ | 2025
SQYD$0.97$0.97$0.971
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) | SQYD | <500 | 2025
SQYD$2.96$2.96$2.961
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | 10,000+ | 2025
SQYD$0.65$0.65$0.651
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR WEEKEND WORK ADD)
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR WEEKEND WORK ADD) | SQYD | <500 | 2025
SQYD$1.62$1.62$1.621
ASPHALT CONCRETE FRICTION COURSE, TRAFFIC C, FC-12.5, PG 76-22
Friction course — FC-12.5
TN$161.50$203.00$280.004
CONCRETE PAVEMENT FOR ROUNDABOUT APRON, 12" DEPTH
Concrete roundabout apron
SY$189.25$189.25$189.251
ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22
Friction course — FC-5
TN$350.00$350.00$350.001
MILLING EXISTING ASPHALT PAVEMENT, 1/2" AVG DEPTH
Milling — 0.5 inch
SY$2.25$2.25$2.251
MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH
Milling — 0.75 inch
SY$4.00$4.00$4.001
MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH
Milling — 1 inch
SY$4.00$4.00$4.001
MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH
Milling — 1.5 inch
SY$4.00$4.00$4.001
MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH
Milling — 2 inch
SY$4.00$4.00$4.001
MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH
Milling — 2.25 inch
SY$2.00$2.00$2.001
MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH
Milling — 3 inch
SY$2.00$2.00$2.001
MISCELLANEOUS ASPHALT PAVEMENT
Miscellaneous asphalt pavement
TN$400.00$400.00$400.001
SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22
Superpave — Traffic C
TN$250.00$250.00$250.001
HMA Approach
hma approach | Ton | 100-999 | 2025
Ton$1.00$151.49$475.00148
HMA Approach
hma approach | Ton | 100-999 | 2026
Ton$0.01$150.00$275.00111
Cold Milling HMA Surface
cold milling hma surface | Syd | 10,000+ | 2025
Syd$0.45$2.00$7.85105
HMA Surface, Rem
hma surface rem | Syd | 100-999 | 2025
Syd$1.25$15.82$95.00105
Cold Milling HMA Surface
cold milling hma surface | Syd | 10,000+ | 2026
Syd$0.32$2.00$10.0083
HMA Surface, Rem
hma surface rem | Syd | 1,000-9,999 | 2025
Syd$0.01$6.00$37.3074
HMA Surface, Rem
hma surface rem | Syd | 100-999 | 2026
Syd$1.00$10.50$50.0071
HMA Approach
hma approach | Ton | <100 | 2025
Ton$94.75$173.35$1,200.0066
HMA, 5EML
hma 5eml | Ton | 1,000-9,999 | 2025
Ton$65.00$100.00$146.0065
HMA Surface, Rem
hma surface rem | Syd | 1,000-9,999 | 2026
Syd$0.01$6.00$40.0061
HMA, 4EML
hma 4eml | Ton | 1,000-9,999 | 2025
Ton$69.35$90.00$135.0055
HMA, 4EL
hma 4el | Ton | 1,000-9,999 | 2025
Ton$61.85$79.00$120.6753
HMA, 4EML
hma 4eml | Ton | 1,000-9,999 | 2026
Ton$54.90$94.00$163.0053
HMA Approach
hma approach | Ton | <100 | 2026
Ton$84.00$189.50$2,000.0052
HMA Quality Initiative
hma quality initiative | Dlr | 10,000+ | 2025
Dlr$1.00$1.00$1.0052
HMA, 5EML
hma 5eml | Ton | 1,000-9,999 | 2026
Ton$71.05$96.91$167.0050
HMA, 4EL
hma 4el | Ton | 1,000-9,999 | 2026
Ton$60.70$80.50$102.0042
HMA Surface, Rem
hma surface rem | Syd | <100 | 2025
Syd$7.50$25.00$100.0041
Cold Milling HMA Surface
cold milling hma surface | Syd | 1,000-9,999 | 2025
Syd$0.56$4.00$65.0038
HMA, 4EL
hma 4el | Ton | 100-999 | 2025
Ton$79.00$117.35$347.6037
HMA Base Crushing and Shaping
hma base crushing and shaping | Syd | 10,000+ | 2025
Syd$0.50$1.75$3.0034
Cold Milling HMA Surface
cold milling hma surface | Syd | 1,000-9,999 | 2026
Syd$0.75$4.30$16.0030
HMA, 4EL
hma 4el | Ton | 100-999 | 2026
Ton$78.78$137.00$270.0030
HMA, 4EML
hma 4eml | Ton | 100-999 | 2025
Ton$80.00$118.50$245.1630
Pavt Joint and Crack Repr, Det 7
pavt joint and crack repr det 7 | Ft | 1,000-9,999 | 2025
Ft$0.01$11.88$50.0030
HMA, 5EML
hma 5eml | Ton | 100-999 | 2025
Ton$74.98$122.50$260.1228
HMA Quality Initiative
hma quality initiative | Dlr | 10,000+ | 2026
Dlr$1.00$1.00$1.0028
HMA, 5EL
hma 5el | Ton | 1,000-9,999 | 2025
Ton$42.39$80.00$115.0027
HMA, 5EML
hma 5eml | Ton | 100-999 | 2026
Ton$85.00$125.04$220.0027
HMA Base Crushing and Shaping
hma base crushing and shaping | Syd | 10,000+ | 2026
Syd$0.54$1.85$9.4627
HMA Surface, Rem
hma surface rem | Syd | <100 | 2026
Syd$5.00$50.00$300.0027
Overband Crack Fill, Lane
overband crack fill lane | Lnmi | <100 | 2025
Lnmi$3,100.00$3,529.95$10,000.0027
Pavt Joint and Crack Repr, Det 7
pavt joint and crack repr det 7 | Ft | 1,000-9,999 | 2026
Ft$5.00$10.00$28.0027
Centerline Corrugations, Milled, HMA
centerline corrugations milled hma | Ft | 10,000+ | 2025
Ft$0.17$0.35$0.9326
HMA Quality Initiative
hma quality initiative | Dlr | 1,000-9,999 | 2025
Dlr$1.00$1.00$1.0024
HMA Surface, Rem
hma surface rem | Syd | 10,000+ | 2025
Syd$0.75$3.19$7.8524
HMA, 5EL
hma 5el | Ton | 1,000-9,999 | 2026
Ton$70.00$81.80$135.0023
Cold Milling HMA Surface
cold milling hma surface | Syd | 100-999 | 2025
Syd$1.63$12.00$87.9021
HMA Surface, Rem
hma surface rem | Syd | 10,000+ | 2026
Syd$1.00$2.74$13.0021
Pavt Joint and Crack Repr, Det 8
pavt joint and crack repr det 8 | Ft | 1,000-9,999 | 2025
Ft$0.01$9.70$35.0020
HMA, 4EML
hma 4eml | Ton | 100-999 | 2026
Ton$83.10$130.00$240.0019
HMA, 5EL
hma 5el | Ton | 100-999 | 2025
Ton$86.00$100.00$143.6019
Sealing Localized Conc Barrier Cracks
sealing localized conc barrier cracks | LSUM | <100 | 2026
LSUM$0.01$500.00$5,500.0019
HMA Approach, High Stress
hma approach high stress | Ton | 100-999 | 2025
Ton$95.00$161.00$273.2117
Sinusoidal Corrugations, Non-Freeway, Milled, HMA Shld
sinusoidal corrugations non-freeway milled hma shld | Ft | 10,000+ | 2025
Ft$0.20$0.46$0.7817
Curb Slp, HMA
curb slp hma | Ft | 1,000-9,999 | 2025
Ft$0.10$1.00$10.0016
HMA, 3EML
hma 3eml | Ton | 1,000-9,999 | 2025
Ton$73.77$92.11$135.0016
HMA Approach
hma approach | Ton | 1,000-9,999 | 2025
Ton$80.00$144.50$192.0016
Overband Crack Fill, Lane
overband crack fill lane | Lnmi | <100 | 2026
Lnmi$3,100.00$4,098.02$8,500.0016
HMA, 5EL
hma 5el | Ton | 100-999 | 2026
Ton$82.00$102.44$200.0015
HMA, 5EML
hma 5eml | Ton | 10,000+ | 2025
Ton$64.75$92.08$133.7415
_HMA Spillway
_hma spillway | Syd | <100 | 2025
Syd$25.00$60.80$239.2614
Curb Slp, HMA
curb slp hma | Ft | 1,000-9,999 | 2026
Ft$0.10$1.00$6.0014
HMA, 3EML
hma 3eml | Ton | 100-999 | 2025
Ton$94.94$113.25$160.0014
HMA, 3EML
hma 3eml | Ton | 100-999 | 2026
Ton$81.00$132.62$190.0014
HMA, 5EML, High Stress
hma 5eml high stress | Ton | 1,000-9,999 | 2025
Ton$84.00$108.12$152.0014
Sealing Localized Conc Barrier Cracks
sealing localized conc barrier cracks | LSUM | <100 | 2025
LSUM$0.01$2,781.06$26,716.0314
Curb Slp, HMA
curb slp hma | Ft | 100-999 | 2026
Ft$0.10$1.26$5.0013
HMA, 3EML
hma 3eml | Ton | 1,000-9,999 | 2026
Ton$62.15$99.04$118.0013
Pavt Repr, Rem
pavt repr rem | Syd | 1,000-9,999 | 2025
Syd$14.75$23.00$43.0513
INCIDENTAL MILLING
INCIDENTAL MILLING | SY
SY$2.18$11.80$88.00147
AGGREGATE SHOULDER BORROW
AGGREGATE SHOULDER BORROW | TON
TON$17.00$32.00$55.0063
PATCHING EXIST PAVEMENT
PATCHING EXIST PAVEMENT | TON
TON$101.00$145.00$500.0060
REMOVAL OF EXT ASPHALT PVMT
REMOVAL OF EXT ASPHALT PVMT | SY
SY$3.50$12.07$125.0039
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (0" TO 1-1/2") | SY
SY$1.70$9.15$240.0028
GENERIC PAVING ITEM (LF) 665
GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (16") | LF
LF$0.24$1.00$15.2514
GENERIC PAVING ITEM (LF) 665
GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), 16" | LF
LF$0.20$0.32$16.008
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (0" TO 3") | SY
SY$3.50$11.50$35.238
PATCHING EXIST PAVEMENT (MILL)
PATCHING EXIST PAVEMENT (MILL) | TON
TON$136.90$159.00$196.008
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (0" TO 1") | SY
SY$3.00$13.25$163.004
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (0" TO 1-1/4") | SY
SY$2.50$15.93$37.004
ASPHALT CURING SEAL
ASPHALT CURING SEAL | GAL
GAL$4.03$5.75$6.003
GENERIC PAVING ITEM (LF) 665
GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (12") | LF
LF$0.38$1.40$5.003
GENERIC PAVING ITEM (LF)
GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (18") | LF
LF$0.38$0.44$4.753
GENERIC PAVING ITEM (LB)
GENERIC PAVING ITEM (LB) | FLEXIBLE REPAIR FOR EXISTING PAVEMENT CRACKS | LB
LB$2.79$3.15$3.502
GENERIC PAVING ITEM (LF)
GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (14") | LF
LF$0.70$0.80$0.912
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | DIAMOND GRINDING PCC PAVEMENT | SY
SY$3.00$4.88$6.772
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | FINE MILLING | SY
SY$6.00$9.95$13.902
GENERIC PAVING ITEM (TON)
GENERIC PAVING ITEM (TON) | ASPHALT CONC INTERMEDIATE COURSE, TYPE I19.0C (LEVELING COURSE) | TON
TON$49.00$53.59$58.192
GENERIC PAVING ITEM (TON)
GENERIC PAVING ITEM (TON) | ASPHALT CONC SURFACE COURSE, TYPE S9.5C (WEDGING COURSE) | TON
TON$90.00$108.00$126.002
GENERIC PAVING ITEM (LB)
GENERIC PAVING ITEM (LB) | FIBER REINFORCEMENT OF ASPHALT | LB
LB$12.00$12.00$12.001
GENERIC PAVING ITEM (LB)
GENERIC PAVING ITEM (LB) | FLEXIBLE REPAIR FOR EXISTING PAVEMENT CRACKS AND JOINTS | LB
LB$5.07$5.07$5.071
GENERIC PAVING ITEM (LF) 665
GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE) (16") | LF
LF$0.25$0.25$0.251
GENERIC PAVING ITEM (LF) 665
GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (6") | LF
LF$0.48$0.48$0.481
GENERIC PAVING ITEM (LF) 665
GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), 12" | LF
LF$0.21$0.21$0.211
GENERIC PAVING ITEM (LF)
GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (16") | LF
LF$0.70$0.70$0.701
GENERIC PAVING ITEM (LF)
GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), 18" | LF
LF$0.23$0.23$0.231
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | 6" JOINTED CONCRETE PAVEMENT WITH WIRE MESH REINFORCEMENT | SY
SY$104.00$104.00$104.001
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | FINE MILLING, 1-1/2" DEPTH | SY
SY$7.00$7.00$7.001
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | FULL DEPTH RECLAMATION BASE | SY
SY$5.25$5.25$5.251
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | HIGH FRICTION SURFACE TREATMENT | SY
SY$30.10$30.10$30.101
GENERIC PAVING ITEM (SY)
GENERIC PAVING ITEM (SY) | STAMPED ASPHALT | SY
SY$50.00$50.00$50.001
GENERIC PAVING ITEM (TON)
GENERIC PAVING ITEM (TON) | ASPHALT CAP, TYPE S9.5C | TON
TON$250.00$250.00$250.001
GENERIC PAVING ITEM (TON)
GENERIC PAVING ITEM (TON) | ASPHALT CONC INTERMEDIATE COURSE, TYPE I19.0C (WEDGING COURSE) | TON
TON$160.00$160.00$160.001
GENERIC PAVING ITEM (TON)
GENERIC PAVING ITEM (TON) | ASPHALT CONC SURFACE COURSE, TYPE S4.75A (LEVELING COURSE) | TON
TON$145.00$145.00$145.001
GENERIC RET WALL ITEM (SF)
GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 1) | SF
SF$1.15$1.15$1.151
GENERIC RET WALL ITEM (SF)
GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 4) | SF
SF$1.15$1.15$1.151
GENERIC RET WALL ITEM (SF)
GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 5) | SF
SF$1.15$1.15$1.151
GENERIC RET WALL ITEM (SF)
GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 6/7) | SF
SF$1.15$1.15$1.151
GENERIC RET WALL ITEM (SF)
GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT | SF
SF$15.00$15.00$15.001
GENERIC RET WALL ITEM (SF)
GENERIC RET WALL ITEM (SF) | SCULPTED SHOTCRETE SURFACE TREATMENT | SF
SF$27.90$27.90$27.901
GENERIC STRUCTURE ITEM (LF)
GENERIC STRUCTURE ITEM (LF) | ASPHALT PLUG JOINT FOR PRESERVATION | LF
LF$160.00$160.00$160.001
GENERIC STRUCTURE ITEM (SF)
GENERIC STRUCTURE ITEM (SF) | ARCHITECTURAL CONCRETE SURFACE TREATMENT | SF
SF$50.79$50.79$50.791
GENERIC STRUCTURE ITEM (SF)
GENERIC STRUCTURE ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 1) | SF
SF$1.75$1.75$1.751
GENERIC STRUCTURE ITEM (TON)
GENERIC STRUCTURE ITEM (TON) | BRIDGE DECK ASPHALT PATCHING | TON
TON$600.00$600.00$600.001
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (0" TO 2") | SY
SY$9.00$9.00$9.001
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (0-3/4" TO 1-1/2") | SY
SY$3.00$3.00$3.001
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (1" TO 2") | SY
SY$3.90$3.90$3.901
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (1" TO 3") | SY
SY$4.65$4.65$4.651
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (1-1/2" TO 3") | SY
SY$15.00$15.00$15.001
MILLN ASPHALT PVMT ***** - *****
MILLN ASPHALT PVMT ***** - ***** | (2-1/2" TO 4") | SY
SY$12.75$12.75$12.751
PATCHING EXIST PAVEMENT (FULL DEPTH)
PATCHING EXIST PAVEMENT (FULL DEPTH) | TON
TON$250.00$250.00$250.001
Site Preparation & Mobilization (Not to Exceed 5%)
CWF25-100-06 / 200.1 / LS / qty 1
LS$125,000.00$125,000.00$125,000.001
Type D Hot Mix Asphalt
CWF25-100-06 / 302-D / TON / qty 3375
TON$142.50$142.50$142.501
Remove & Replace Curb & Gutter
CWF25-100-06 / 305.1 / LF / qty 755
LF$85.00$85.00$85.001
Pedestrian Ramps
CWF25-100-06 / 305.2-PR / EA / qty 1
EA$3,200.00$3,200.00$3,200.001
Remove & Replace 4" Concrete Sidewalk
CWF25-100-06 / 305.2-SW / SY / qty 5
SY$210.00$210.00$210.001
Remove & Replace Valley Gutter
CWF25-100-06 / 305.2-VG / SY / qty 100
SY$210.00$210.00$210.001
10" Base Repair
CWF25-100-06 / 402-10 / SY / qty 3545
SY$105.00$105.00$105.001
6" Base Repair
CWF25-100-06 / 402-6 / SY / qty 385
SY$125.00$125.00$125.001
9" Base Repair
CWF25-100-06 / 402-9 / SY / qty 13675
SY$87.00$87.00$87.001
Milling
CWF25-100-06 / 403-M / SY / qty 14750
SY$3.00$3.00$3.001
Temporary Traffic Control
CWF25-100-06 / 801 / LS / qty 1
LS$125,000.00$125,000.00$125,000.001
24" White Solid Striping (Stop Bar & Crosswalk) - 100 mil thick
CWF25-100-06 / 804-24WS / LF / qty 140
LF$8.25$8.25$8.251
4" White Dash Striping - 100 mil thick
CWF25-100-06 / 804-4WD / LF / qty 3130
LF$0.75$0.75$0.751
4" White Solid Striping - 100 mil thick
CWF25-100-06 / 804-4WS / LF / qty 100
LF$0.70$0.70$0.701
4" Yellow Solid Striping - 100 mil thick
CWF25-100-06 / 804-4YS / LF / qty 12060
LF$0.70$0.70$0.701
Shared Bicycle Lane Pavement Marking - Prefab Type C
CWF25-100-06 / 804-B / EA / qty 45
EA$220.00$220.00$220.001
Left Turn Only Arrow - Prefab Type C
CWF25-100-06 / 804-LSA / EA / qty 1
EA$300.00$300.00$300.001
Only Pavement Marking - Prefab Type C
CWF25-100-06 / 804-O / EA / qty 1
EA$325.00$325.00$325.001
Yield Arrow - Prefab Type C
CWF25-100-06 / 804-YA / EA / qty 4
EA$50.00$50.00$50.001

Directional only. Ranges span states, specs and quantities and are not treatment-normalized. Low and high are the 10th to 90th percentile of observed unit bids. Confirm against comparable item, spec, quantity, geography and date before pricing.

Texas is the largest captured market

$12B of captured public awards across 435 events, the deepest single-state footprint in the radar.

Texas shows the most forward motion

516 tracked forward opportunities. Pair the pipeline depth with local buyer relationships to convert.

Rehab / resurfacing leads in 3 of 8 states

Resurfacing and rehabilitation is the dominant lane by captured value across most of the footprint, the core recurring public-market demand.