Public pavement activity by state
Jump to a state
Captured value
Select a state
Click a bubble on the map (or a row on the right) to see its category mix, state vs local split, and top public buyers.
Cross-state category mix
Captured awarded value
Unit-price benchmarks (directional)
Folded from itemized bid-tab observations
| Treatment | Unit | Low | Median | High | Obs. |
|---|---|---|---|---|---|
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 10,000+ | 2025 | SQYD | $1.00 | $3.50 | $15.00 | 105 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | <500 | 2025 | TON | $87.18 | $522.50 | $12,500.00 | 96 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | <500 | 2026 | TON | $125.00 | $475.00 | $2,625.00 | 75 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | 10,000+ | 2025 | TON | $67.65 | $130.00 | $220.00 | 54 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | 500–1,999 | 2025 | TON | $109.70 | $215.00 | $850.00 | 53 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 10,000+ | 2026 | SQYD | $0.70 | $2.75 | $10.00 | 48 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | 2,000–9,999 | 2025 | TON | $99.36 | $166.00 | $300.00 | 45 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 10,000+ | 2025 | TON | $77.35 | $147.50 | $199.00 | 42 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 500–1,999 | 2025 | SQYD | $6.00 | $17.00 | $90.00 | 37 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 2,000–9,999 | 2025 | SQYD | $2.00 | $8.84 | $44.00 | 34 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 2,000–9,999 | 2026 | SQYD | $2.00 | $10.50 | $38.00 | 25 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | 500–1,999 | 2026 | SQYD | $3.00 | $19.00 | $55.00 | 25 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | 500–1,999 | 2026 | TON | $150.00 | $202.00 | $358.00 | 25 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | <500 | 2025 | SQYD | $2.20 | $78.00 | $900.00 | 24 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 2,000–9,999 | 2025 | TON | $137.00 | $185.00 | $260.00 | 23 |
COLD PLANE ASPHALT CONCRETE PAVEMENT COLD PLANE ASPHALT CONCRETE PAVEMENT | SQYD | <500 | 2026 | SQYD | $6.00 | $55.00 | $1,000.00 | 19 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | 10,000+ | 2026 | TON | $92.00 | $118.00 | $190.00 | 19 |
HOT MIX ASPHALT (TYPE A) HOT MIX ASPHALT (TYPE A) | TON | 2,000–9,999 | 2026 | TON | $103.73 | $145.00 | $234.00 | 19 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 500–1,999 | 2025 | TON | $140.00 | $230.00 | $554.13 | 15 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 10,000+ | 2026 | TON | $111.00 | $150.00 | $222.00 | 13 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | <500 | 2025 | TON | $175.00 | $369.09 | $3,200.00 | 12 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 2,000–9,999 | 2026 | TON | $114.00 | $172.50 | $237.00 | 8 |
HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | TON | <500 | 2025 | TON | $63.68 | $2,600.00 | $2,600.00 | 7 |
MICRO-SURFACING MICRO-SURFACING | TON | 500–1,999 | 2025 | TON | $100.00 | $200.00 | $340.00 | 7 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 2,000–9,999 | 2026 | TON | $149.00 | $180.00 | $226.00 | 7 |
HOT MIX ASPHALT (TYPE A)(1-100 TON) HOT MIX ASPHALT (TYPE A)(1-100 TON) | TON | <500 | 2025 | TON | $260.04 | $311.88 | $311.88 | 6 |
MICRO-SURFACING MICRO-SURFACING | TON | 2,000–9,999 | 2025 | TON | $85.00 | $205.00 | $265.00 | 6 |
MICRO-SURFACING MICRO-SURFACING | TON | 2,000–9,999 | 2026 | TON | $80.00 | $127.50 | $265.00 | 6 |
MICRO-SURFACING MICRO-SURFACING | TON | 500–1,999 | 2026 | TON | $135.00 | $280.00 | $400.00 | 5 |
SLURRY SEAL SLURRY SEAL | TON | 500–1,999 | 2025 | TON | $142.00 | $170.00 | $550.00 | 5 |
SLURRY SEAL SLURRY SEAL | TON | 500–1,999 | 2026 | TON | $232.00 | $329.50 | $384.00 | 4 |
SLURRY SEAL SLURRY SEAL | TON | <500 | 2025 | TON | $515.00 | $632.50 | $5,000.00 | 4 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | 500–1,999 | 2025 | SQYD | $5.79 | $13.94 | $13.94 | 3 |
HOT MIX ASPHALT (TYPE A)(FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) HOT MIX ASPHALT (TYPE A)(FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) | TON | <500 | 2025 | TON | $8.11 | $30.10 | $98.80 | 3 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | <500 | 2026 | TON | $265.00 | $480.00 | $840.00 | 3 |
SLURRY SEAL SLURRY SEAL | TON | <500 | 2026 | TON | $555.00 | $620.00 | $2,290.00 | 3 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | 2,000–9,999 | 2025 | SQYD | $5.21 | $9.57 | $13.94 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | <500 | 2025 | SQYD | $13.94 | $18.41 | $22.88 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) | SQYD | <500 | 2025 | SQYD | $0.97 | $2.14 | $3.31 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) | SQYD | 2,000–9,999 | 2025 | SQYD | $2.96 | $4.11 | $5.25 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) | SQYD | 500–1,999 | 2025 | SQYD | $2.85 | $2.91 | $2.96 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | 2,000–9,999 | 2025 | SQYD | $0.65 | $2.98 | $5.30 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | 500–1,999 | 2025 | SQYD | $5.30 | $5.30 | $5.30 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | <500 | 2025 | SQYD | $5.30 | $5.77 | $6.24 | 2 |
HOT MIX ASPHALT (TYPE A)(501-2,000 TON) HOT MIX ASPHALT (TYPE A)(501-2,000 TON) | TON | 500–1,999 | 2025 | TON | $183.83 | $242.72 | $301.60 | 2 |
HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) HOT MIX ASPHALT (TYPE A)(FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | TON | 500–1,999 | 2025 | TON | $18.60 | $1,309.30 | $2,600.00 | 2 |
MICRO-SURFACING MICRO-SURFACING | TON | <500 | 2026 | TON | $445.00 | $622.50 | $800.00 | 2 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 10,000+ | 2026 | TON | $85.00 | $107.50 | $130.00 | 2 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP | TON | 500–1,999 | 2026 | TON | $265.00 | $271.00 | $277.00 | 2 |
RUBBERIZED HOT MIX ASPHALT (GAP GRADED) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | TON | 500–1,999 | 2026 | TON | $203.00 | $219.50 | $236.00 | 2 |
SLURRY SEAL SLURRY SEAL | TON | 2,000–9,999 | 2025 | TON | $240.00 | $302.50 | $365.00 | 2 |
SLURRY SEAL SLURRY SEAL | TON | 2,000–9,999 | 2026 | TON | $125.00 | $137.50 | $150.00 | 2 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (0.4' DEPTH) COLD PLANE ASPHALT CONCRETE PAVEMENT (0.4' DEPTH) | SQYD | 2,000–9,999 | 2026 | SQYD | $7.60 | $7.60 | $7.60 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.15') | SQYD | 10,000+ | 2026 | SQYD | $2.44 | $2.44 | $2.44 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25') COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25') | SQYD | 10,000+ | 2025 | SQYD | $8.82 | $8.82 | $8.82 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25') COLD PLANE ASPHALT CONCRETE PAVEMENT (DEPTH 0.25') | SQYD | 2,000–9,999 | 2025 | SQYD | $8.82 | $8.82 | $8.82 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR EACH WORK RESTRICTED HOUR LESS THAN 8 HOURS ADD) | SQYD | 10,000+ | 2025 | SQYD | $0.97 | $0.97 | $0.97 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR LESS THAN 15,000 SQYD ADD) | SQYD | <500 | 2025 | SQYD | $2.96 | $2.96 | $2.96 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR NIGHT TIME WORK 7:30 PM TO 6:00 AM ADD) | SQYD | 10,000+ | 2025 | SQYD | $0.65 | $0.65 | $0.65 | 1 |
COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR WEEKEND WORK ADD) COLD PLANE ASPHALT CONCRETE PAVEMENT (FOR WEEKEND WORK ADD) | SQYD | <500 | 2025 | SQYD | $1.62 | $1.62 | $1.62 | 1 |
ASPHALT CONCRETE FRICTION COURSE, TRAFFIC C, FC-12.5, PG 76-22 Friction course — FC-12.5 | TN | $161.50 | $203.00 | $280.00 | 4 |
CONCRETE PAVEMENT FOR ROUNDABOUT APRON, 12" DEPTH Concrete roundabout apron | SY | $189.25 | $189.25 | $189.25 | 1 |
ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22 Friction course — FC-5 | TN | $350.00 | $350.00 | $350.00 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 1/2" AVG DEPTH Milling — 0.5 inch | SY | $2.25 | $2.25 | $2.25 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH Milling — 0.75 inch | SY | $4.00 | $4.00 | $4.00 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH Milling — 1 inch | SY | $4.00 | $4.00 | $4.00 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH Milling — 1.5 inch | SY | $4.00 | $4.00 | $4.00 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH Milling — 2 inch | SY | $4.00 | $4.00 | $4.00 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH Milling — 2.25 inch | SY | $2.00 | $2.00 | $2.00 | 1 |
MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH Milling — 3 inch | SY | $2.00 | $2.00 | $2.00 | 1 |
MISCELLANEOUS ASPHALT PAVEMENT Miscellaneous asphalt pavement | TN | $400.00 | $400.00 | $400.00 | 1 |
SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 Superpave — Traffic C | TN | $250.00 | $250.00 | $250.00 | 1 |
HMA Approach hma approach | Ton | 100-999 | 2025 | Ton | $1.00 | $151.49 | $475.00 | 148 |
HMA Approach hma approach | Ton | 100-999 | 2026 | Ton | $0.01 | $150.00 | $275.00 | 111 |
Cold Milling HMA Surface cold milling hma surface | Syd | 10,000+ | 2025 | Syd | $0.45 | $2.00 | $7.85 | 105 |
HMA Surface, Rem hma surface rem | Syd | 100-999 | 2025 | Syd | $1.25 | $15.82 | $95.00 | 105 |
Cold Milling HMA Surface cold milling hma surface | Syd | 10,000+ | 2026 | Syd | $0.32 | $2.00 | $10.00 | 83 |
HMA Surface, Rem hma surface rem | Syd | 1,000-9,999 | 2025 | Syd | $0.01 | $6.00 | $37.30 | 74 |
HMA Surface, Rem hma surface rem | Syd | 100-999 | 2026 | Syd | $1.00 | $10.50 | $50.00 | 71 |
HMA Approach hma approach | Ton | <100 | 2025 | Ton | $94.75 | $173.35 | $1,200.00 | 66 |
HMA, 5EML hma 5eml | Ton | 1,000-9,999 | 2025 | Ton | $65.00 | $100.00 | $146.00 | 65 |
HMA Surface, Rem hma surface rem | Syd | 1,000-9,999 | 2026 | Syd | $0.01 | $6.00 | $40.00 | 61 |
HMA, 4EML hma 4eml | Ton | 1,000-9,999 | 2025 | Ton | $69.35 | $90.00 | $135.00 | 55 |
HMA, 4EL hma 4el | Ton | 1,000-9,999 | 2025 | Ton | $61.85 | $79.00 | $120.67 | 53 |
HMA, 4EML hma 4eml | Ton | 1,000-9,999 | 2026 | Ton | $54.90 | $94.00 | $163.00 | 53 |
HMA Approach hma approach | Ton | <100 | 2026 | Ton | $84.00 | $189.50 | $2,000.00 | 52 |
HMA Quality Initiative hma quality initiative | Dlr | 10,000+ | 2025 | Dlr | $1.00 | $1.00 | $1.00 | 52 |
HMA, 5EML hma 5eml | Ton | 1,000-9,999 | 2026 | Ton | $71.05 | $96.91 | $167.00 | 50 |
HMA, 4EL hma 4el | Ton | 1,000-9,999 | 2026 | Ton | $60.70 | $80.50 | $102.00 | 42 |
HMA Surface, Rem hma surface rem | Syd | <100 | 2025 | Syd | $7.50 | $25.00 | $100.00 | 41 |
Cold Milling HMA Surface cold milling hma surface | Syd | 1,000-9,999 | 2025 | Syd | $0.56 | $4.00 | $65.00 | 38 |
HMA, 4EL hma 4el | Ton | 100-999 | 2025 | Ton | $79.00 | $117.35 | $347.60 | 37 |
HMA Base Crushing and Shaping hma base crushing and shaping | Syd | 10,000+ | 2025 | Syd | $0.50 | $1.75 | $3.00 | 34 |
Cold Milling HMA Surface cold milling hma surface | Syd | 1,000-9,999 | 2026 | Syd | $0.75 | $4.30 | $16.00 | 30 |
HMA, 4EL hma 4el | Ton | 100-999 | 2026 | Ton | $78.78 | $137.00 | $270.00 | 30 |
HMA, 4EML hma 4eml | Ton | 100-999 | 2025 | Ton | $80.00 | $118.50 | $245.16 | 30 |
Pavt Joint and Crack Repr, Det 7 pavt joint and crack repr det 7 | Ft | 1,000-9,999 | 2025 | Ft | $0.01 | $11.88 | $50.00 | 30 |
HMA, 5EML hma 5eml | Ton | 100-999 | 2025 | Ton | $74.98 | $122.50 | $260.12 | 28 |
HMA Quality Initiative hma quality initiative | Dlr | 10,000+ | 2026 | Dlr | $1.00 | $1.00 | $1.00 | 28 |
HMA, 5EL hma 5el | Ton | 1,000-9,999 | 2025 | Ton | $42.39 | $80.00 | $115.00 | 27 |
HMA, 5EML hma 5eml | Ton | 100-999 | 2026 | Ton | $85.00 | $125.04 | $220.00 | 27 |
HMA Base Crushing and Shaping hma base crushing and shaping | Syd | 10,000+ | 2026 | Syd | $0.54 | $1.85 | $9.46 | 27 |
HMA Surface, Rem hma surface rem | Syd | <100 | 2026 | Syd | $5.00 | $50.00 | $300.00 | 27 |
Overband Crack Fill, Lane overband crack fill lane | Lnmi | <100 | 2025 | Lnmi | $3,100.00 | $3,529.95 | $10,000.00 | 27 |
Pavt Joint and Crack Repr, Det 7 pavt joint and crack repr det 7 | Ft | 1,000-9,999 | 2026 | Ft | $5.00 | $10.00 | $28.00 | 27 |
Centerline Corrugations, Milled, HMA centerline corrugations milled hma | Ft | 10,000+ | 2025 | Ft | $0.17 | $0.35 | $0.93 | 26 |
HMA Quality Initiative hma quality initiative | Dlr | 1,000-9,999 | 2025 | Dlr | $1.00 | $1.00 | $1.00 | 24 |
HMA Surface, Rem hma surface rem | Syd | 10,000+ | 2025 | Syd | $0.75 | $3.19 | $7.85 | 24 |
HMA, 5EL hma 5el | Ton | 1,000-9,999 | 2026 | Ton | $70.00 | $81.80 | $135.00 | 23 |
Cold Milling HMA Surface cold milling hma surface | Syd | 100-999 | 2025 | Syd | $1.63 | $12.00 | $87.90 | 21 |
HMA Surface, Rem hma surface rem | Syd | 10,000+ | 2026 | Syd | $1.00 | $2.74 | $13.00 | 21 |
Pavt Joint and Crack Repr, Det 8 pavt joint and crack repr det 8 | Ft | 1,000-9,999 | 2025 | Ft | $0.01 | $9.70 | $35.00 | 20 |
HMA, 4EML hma 4eml | Ton | 100-999 | 2026 | Ton | $83.10 | $130.00 | $240.00 | 19 |
HMA, 5EL hma 5el | Ton | 100-999 | 2025 | Ton | $86.00 | $100.00 | $143.60 | 19 |
Sealing Localized Conc Barrier Cracks sealing localized conc barrier cracks | LSUM | <100 | 2026 | LSUM | $0.01 | $500.00 | $5,500.00 | 19 |
HMA Approach, High Stress hma approach high stress | Ton | 100-999 | 2025 | Ton | $95.00 | $161.00 | $273.21 | 17 |
Sinusoidal Corrugations, Non-Freeway, Milled, HMA Shld sinusoidal corrugations non-freeway milled hma shld | Ft | 10,000+ | 2025 | Ft | $0.20 | $0.46 | $0.78 | 17 |
Curb Slp, HMA curb slp hma | Ft | 1,000-9,999 | 2025 | Ft | $0.10 | $1.00 | $10.00 | 16 |
HMA, 3EML hma 3eml | Ton | 1,000-9,999 | 2025 | Ton | $73.77 | $92.11 | $135.00 | 16 |
HMA Approach hma approach | Ton | 1,000-9,999 | 2025 | Ton | $80.00 | $144.50 | $192.00 | 16 |
Overband Crack Fill, Lane overband crack fill lane | Lnmi | <100 | 2026 | Lnmi | $3,100.00 | $4,098.02 | $8,500.00 | 16 |
HMA, 5EL hma 5el | Ton | 100-999 | 2026 | Ton | $82.00 | $102.44 | $200.00 | 15 |
HMA, 5EML hma 5eml | Ton | 10,000+ | 2025 | Ton | $64.75 | $92.08 | $133.74 | 15 |
_HMA Spillway _hma spillway | Syd | <100 | 2025 | Syd | $25.00 | $60.80 | $239.26 | 14 |
Curb Slp, HMA curb slp hma | Ft | 1,000-9,999 | 2026 | Ft | $0.10 | $1.00 | $6.00 | 14 |
HMA, 3EML hma 3eml | Ton | 100-999 | 2025 | Ton | $94.94 | $113.25 | $160.00 | 14 |
HMA, 3EML hma 3eml | Ton | 100-999 | 2026 | Ton | $81.00 | $132.62 | $190.00 | 14 |
HMA, 5EML, High Stress hma 5eml high stress | Ton | 1,000-9,999 | 2025 | Ton | $84.00 | $108.12 | $152.00 | 14 |
Sealing Localized Conc Barrier Cracks sealing localized conc barrier cracks | LSUM | <100 | 2025 | LSUM | $0.01 | $2,781.06 | $26,716.03 | 14 |
Curb Slp, HMA curb slp hma | Ft | 100-999 | 2026 | Ft | $0.10 | $1.26 | $5.00 | 13 |
HMA, 3EML hma 3eml | Ton | 1,000-9,999 | 2026 | Ton | $62.15 | $99.04 | $118.00 | 13 |
Pavt Repr, Rem pavt repr rem | Syd | 1,000-9,999 | 2025 | Syd | $14.75 | $23.00 | $43.05 | 13 |
INCIDENTAL MILLING INCIDENTAL MILLING | SY | SY | $2.18 | $11.80 | $88.00 | 147 |
AGGREGATE SHOULDER BORROW AGGREGATE SHOULDER BORROW | TON | TON | $17.00 | $32.00 | $55.00 | 63 |
PATCHING EXIST PAVEMENT PATCHING EXIST PAVEMENT | TON | TON | $101.00 | $145.00 | $500.00 | 60 |
REMOVAL OF EXT ASPHALT PVMT REMOVAL OF EXT ASPHALT PVMT | SY | SY | $3.50 | $12.07 | $125.00 | 39 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (0" TO 1-1/2") | SY | SY | $1.70 | $9.15 | $240.00 | 28 |
GENERIC PAVING ITEM (LF) 665 GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (16") | LF | LF | $0.24 | $1.00 | $15.25 | 14 |
GENERIC PAVING ITEM (LF) 665 GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), 16" | LF | LF | $0.20 | $0.32 | $16.00 | 8 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (0" TO 3") | SY | SY | $3.50 | $11.50 | $35.23 | 8 |
PATCHING EXIST PAVEMENT (MILL) PATCHING EXIST PAVEMENT (MILL) | TON | TON | $136.90 | $159.00 | $196.00 | 8 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (0" TO 1") | SY | SY | $3.00 | $13.25 | $163.00 | 4 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (0" TO 1-1/4") | SY | SY | $2.50 | $15.93 | $37.00 | 4 |
ASPHALT CURING SEAL ASPHALT CURING SEAL | GAL | GAL | $4.03 | $5.75 | $6.00 | 3 |
GENERIC PAVING ITEM (LF) 665 GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (12") | LF | LF | $0.38 | $1.40 | $5.00 | 3 |
GENERIC PAVING ITEM (LF) GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (18") | LF | LF | $0.38 | $0.44 | $4.75 | 3 |
GENERIC PAVING ITEM (LB) GENERIC PAVING ITEM (LB) | FLEXIBLE REPAIR FOR EXISTING PAVEMENT CRACKS | LB | LB | $2.79 | $3.15 | $3.50 | 2 |
GENERIC PAVING ITEM (LF) GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (14") | LF | LF | $0.70 | $0.80 | $0.91 | 2 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | DIAMOND GRINDING PCC PAVEMENT | SY | SY | $3.00 | $4.88 | $6.77 | 2 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | FINE MILLING | SY | SY | $6.00 | $9.95 | $13.90 | 2 |
GENERIC PAVING ITEM (TON) GENERIC PAVING ITEM (TON) | ASPHALT CONC INTERMEDIATE COURSE, TYPE I19.0C (LEVELING COURSE) | TON | TON | $49.00 | $53.59 | $58.19 | 2 |
GENERIC PAVING ITEM (TON) GENERIC PAVING ITEM (TON) | ASPHALT CONC SURFACE COURSE, TYPE S9.5C (WEDGING COURSE) | TON | TON | $90.00 | $108.00 | $126.00 | 2 |
GENERIC PAVING ITEM (LB) GENERIC PAVING ITEM (LB) | FIBER REINFORCEMENT OF ASPHALT | LB | LB | $12.00 | $12.00 | $12.00 | 1 |
GENERIC PAVING ITEM (LB) GENERIC PAVING ITEM (LB) | FLEXIBLE REPAIR FOR EXISTING PAVEMENT CRACKS AND JOINTS | LB | LB | $5.07 | $5.07 | $5.07 | 1 |
GENERIC PAVING ITEM (LF) 665 GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE) (16") | LF | LF | $0.25 | $0.25 | $0.25 | 1 |
GENERIC PAVING ITEM (LF) 665 GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (6") | LF | LF | $0.48 | $0.48 | $0.48 | 1 |
GENERIC PAVING ITEM (LF) 665 GENERIC PAVING ITEM (LF) 665 | MILLED RUMBLE STRIPS (ASPHALT CONCRETE), 12" | LF | LF | $0.21 | $0.21 | $0.21 | 1 |
GENERIC PAVING ITEM (LF) GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), (16") | LF | LF | $0.70 | $0.70 | $0.70 | 1 |
GENERIC PAVING ITEM (LF) GENERIC PAVING ITEM (LF) | CENTERLINE MILLED RUMBLE STRIPS (ASPHALT CONCRETE), 18" | LF | LF | $0.23 | $0.23 | $0.23 | 1 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | 6" JOINTED CONCRETE PAVEMENT WITH WIRE MESH REINFORCEMENT | SY | SY | $104.00 | $104.00 | $104.00 | 1 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | FINE MILLING, 1-1/2" DEPTH | SY | SY | $7.00 | $7.00 | $7.00 | 1 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | FULL DEPTH RECLAMATION BASE | SY | SY | $5.25 | $5.25 | $5.25 | 1 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | HIGH FRICTION SURFACE TREATMENT | SY | SY | $30.10 | $30.10 | $30.10 | 1 |
GENERIC PAVING ITEM (SY) GENERIC PAVING ITEM (SY) | STAMPED ASPHALT | SY | SY | $50.00 | $50.00 | $50.00 | 1 |
GENERIC PAVING ITEM (TON) GENERIC PAVING ITEM (TON) | ASPHALT CAP, TYPE S9.5C | TON | TON | $250.00 | $250.00 | $250.00 | 1 |
GENERIC PAVING ITEM (TON) GENERIC PAVING ITEM (TON) | ASPHALT CONC INTERMEDIATE COURSE, TYPE I19.0C (WEDGING COURSE) | TON | TON | $160.00 | $160.00 | $160.00 | 1 |
GENERIC PAVING ITEM (TON) GENERIC PAVING ITEM (TON) | ASPHALT CONC SURFACE COURSE, TYPE S4.75A (LEVELING COURSE) | TON | TON | $145.00 | $145.00 | $145.00 | 1 |
GENERIC RET WALL ITEM (SF) GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 1) | SF | SF | $1.15 | $1.15 | $1.15 | 1 |
GENERIC RET WALL ITEM (SF) GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 4) | SF | SF | $1.15 | $1.15 | $1.15 | 1 |
GENERIC RET WALL ITEM (SF) GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 5) | SF | SF | $1.15 | $1.15 | $1.15 | 1 |
GENERIC RET WALL ITEM (SF) GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 6/7) | SF | SF | $1.15 | $1.15 | $1.15 | 1 |
GENERIC RET WALL ITEM (SF) GENERIC RET WALL ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT | SF | SF | $15.00 | $15.00 | $15.00 | 1 |
GENERIC RET WALL ITEM (SF) GENERIC RET WALL ITEM (SF) | SCULPTED SHOTCRETE SURFACE TREATMENT | SF | SF | $27.90 | $27.90 | $27.90 | 1 |
GENERIC STRUCTURE ITEM (LF) GENERIC STRUCTURE ITEM (LF) | ASPHALT PLUG JOINT FOR PRESERVATION | LF | LF | $160.00 | $160.00 | $160.00 | 1 |
GENERIC STRUCTURE ITEM (SF) GENERIC STRUCTURE ITEM (SF) | ARCHITECTURAL CONCRETE SURFACE TREATMENT | SF | SF | $50.79 | $50.79 | $50.79 | 1 |
GENERIC STRUCTURE ITEM (SF) GENERIC STRUCTURE ITEM (SF) | ARCHITECTURAL SURFACE TREATMENT (SOUND BARRIER WALL NO 1) | SF | SF | $1.75 | $1.75 | $1.75 | 1 |
GENERIC STRUCTURE ITEM (TON) GENERIC STRUCTURE ITEM (TON) | BRIDGE DECK ASPHALT PATCHING | TON | TON | $600.00 | $600.00 | $600.00 | 1 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (0" TO 2") | SY | SY | $9.00 | $9.00 | $9.00 | 1 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (0-3/4" TO 1-1/2") | SY | SY | $3.00 | $3.00 | $3.00 | 1 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (1" TO 2") | SY | SY | $3.90 | $3.90 | $3.90 | 1 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (1" TO 3") | SY | SY | $4.65 | $4.65 | $4.65 | 1 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (1-1/2" TO 3") | SY | SY | $15.00 | $15.00 | $15.00 | 1 |
MILLN ASPHALT PVMT ***** - ***** MILLN ASPHALT PVMT ***** - ***** | (2-1/2" TO 4") | SY | SY | $12.75 | $12.75 | $12.75 | 1 |
PATCHING EXIST PAVEMENT (FULL DEPTH) PATCHING EXIST PAVEMENT (FULL DEPTH) | TON | TON | $250.00 | $250.00 | $250.00 | 1 |
Site Preparation & Mobilization (Not to Exceed 5%) CWF25-100-06 / 200.1 / LS / qty 1 | LS | $125,000.00 | $125,000.00 | $125,000.00 | 1 |
Type D Hot Mix Asphalt CWF25-100-06 / 302-D / TON / qty 3375 | TON | $142.50 | $142.50 | $142.50 | 1 |
Remove & Replace Curb & Gutter CWF25-100-06 / 305.1 / LF / qty 755 | LF | $85.00 | $85.00 | $85.00 | 1 |
Pedestrian Ramps CWF25-100-06 / 305.2-PR / EA / qty 1 | EA | $3,200.00 | $3,200.00 | $3,200.00 | 1 |
Remove & Replace 4" Concrete Sidewalk CWF25-100-06 / 305.2-SW / SY / qty 5 | SY | $210.00 | $210.00 | $210.00 | 1 |
Remove & Replace Valley Gutter CWF25-100-06 / 305.2-VG / SY / qty 100 | SY | $210.00 | $210.00 | $210.00 | 1 |
10" Base Repair CWF25-100-06 / 402-10 / SY / qty 3545 | SY | $105.00 | $105.00 | $105.00 | 1 |
6" Base Repair CWF25-100-06 / 402-6 / SY / qty 385 | SY | $125.00 | $125.00 | $125.00 | 1 |
9" Base Repair CWF25-100-06 / 402-9 / SY / qty 13675 | SY | $87.00 | $87.00 | $87.00 | 1 |
Milling CWF25-100-06 / 403-M / SY / qty 14750 | SY | $3.00 | $3.00 | $3.00 | 1 |
Temporary Traffic Control CWF25-100-06 / 801 / LS / qty 1 | LS | $125,000.00 | $125,000.00 | $125,000.00 | 1 |
24" White Solid Striping (Stop Bar & Crosswalk) - 100 mil thick CWF25-100-06 / 804-24WS / LF / qty 140 | LF | $8.25 | $8.25 | $8.25 | 1 |
4" White Dash Striping - 100 mil thick CWF25-100-06 / 804-4WD / LF / qty 3130 | LF | $0.75 | $0.75 | $0.75 | 1 |
4" White Solid Striping - 100 mil thick CWF25-100-06 / 804-4WS / LF / qty 100 | LF | $0.70 | $0.70 | $0.70 | 1 |
4" Yellow Solid Striping - 100 mil thick CWF25-100-06 / 804-4YS / LF / qty 12060 | LF | $0.70 | $0.70 | $0.70 | 1 |
Shared Bicycle Lane Pavement Marking - Prefab Type C CWF25-100-06 / 804-B / EA / qty 45 | EA | $220.00 | $220.00 | $220.00 | 1 |
Left Turn Only Arrow - Prefab Type C CWF25-100-06 / 804-LSA / EA / qty 1 | EA | $300.00 | $300.00 | $300.00 | 1 |
Only Pavement Marking - Prefab Type C CWF25-100-06 / 804-O / EA / qty 1 | EA | $325.00 | $325.00 | $325.00 | 1 |
Yield Arrow - Prefab Type C CWF25-100-06 / 804-YA / EA / qty 4 | EA | $50.00 | $50.00 | $50.00 | 1 |
Directional only. Ranges span states, specs and quantities and are not treatment-normalized. Low and high are the 10th to 90th percentile of observed unit bids. Confirm against comparable item, spec, quantity, geography and date before pricing.
$12B of captured public awards across 435 events, the deepest single-state footprint in the radar.
516 tracked forward opportunities. Pair the pipeline depth with local buyer relationships to convert.
Resurfacing and rehabilitation is the dominant lane by captured value across most of the footprint, the core recurring public-market demand.